CARITO SHOP ONBOARDING CHECKLIST v1.0
====================================

Document: Carrito_Shop_Onboarding_Checklist.txt
Status: Practical Readiness Checklist
Applies To: New and prospective Carrito participating shops

--------------------------------------------------
PURPOSE
--------------------------------------------------
This checklist helps a shop confirm it is ready to
participate in the Carrito platform honestly and effectively.

It is designed to be printed and checked off.

--------------------------------------------------
SECTION 1 — ADMINISTRATIVE READINESS
--------------------------------------------------
[ ] Read Carrito_Quickstart.txt
[ ] Read Carrito_Mission_and_Vision.txt
[ ] Reviewed Carrito_v1_Master_Index.txt
[ ] Selected intended participation tier (Assembly, Fabrication, Casting)
[ ] Assigned a primary Carrito contact person

--------------------------------------------------
SECTION 2 — TOOLING READINESS
--------------------------------------------------
[ ] Basic hand tools available
[ ] Measurement tools available
[ ] Vehicle lifting or support equipment available

Fabrication shops:
[ ] Welding equipment operational
[ ] Cutting and grinding tools available
[ ] Fixturing capability confirmed

Casting shops:
[ ] Approved furnace setup
[ ] Mold handling tools available
[ ] Safety equipment in place

--------------------------------------------------
SECTION 3 — DOCUMENTATION SYSTEM
--------------------------------------------------
[ ] Vehicle serial tracking method defined
[ ] Power Frame documentation process defined
[ ] Mold usage tracking (if applicable)
[ ] Disclosure and waiver process prepared

--------------------------------------------------
SECTION 4 — BUILD PRACTICES
--------------------------------------------------
[ ] MMF geometry standards understood
[ ] No MMF modification policy adopted
[ ] Inspection checklist process adopted
[ ] Experimental labeling process defined

--------------------------------------------------
SECTION 5 — LEGAL AND DISCLOSURE
--------------------------------------------------
[ ] Baseline vs experimental distinction understood
[ ] No implied certification language policy adopted
[ ] Customer disclosure process in place

--------------------------------------------------
SECTION 6 — FIRST BUILD PLAN
--------------------------------------------------
[ ] Small Grid selected
[ ] Reference Power Frame selected
[ ] No experimental casting planned
[ ] Documentation folder prepared

--------------------------------------------------
SECTION 7 — OPTIONAL PROGRAMS
--------------------------------------------------
[ ] Helping Hand modules reviewed
[ ] Casting program reviewed
[ ] Mold licensing reviewed

--------------------------------------------------
FINAL CONFIRMATION
--------------------------------------------------
[ ] We understand our responsibilities
[ ] We agree to follow platform standards
[ ] We will disclose honestly

--------------------------------------------------
SUMMARY
--------------------------------------------------
If all required items are checked,
the shop is ready to participate.

--------------------------------------------------
END OF SHOP ONBOARDING CHECKLIST
--------------------------------------------------
